New Builds

Oatlands House

View more photos →

New 4-Bedroom Dwelling – Weybridge

We replaced an old property with a new 5-bedroom property with modern features and a detached Garden Building.  Externally we used white render, zinc cladding and plain roof tiles. Due to the slope on the site the rear open-plan Kitchen / Dining / Living area has 3m high ceilings. The proeprty also includes an air-source heat pump and solar panels. Construction was completed in 2024.


Driftwood

View more photos →

New 4-Bedroom Dwelling

We replaced a dated bungalow with a new 4-bedroom property with modern features.  Externally we used white render and timber cladding. Internally we have introduced natural light throughout to maximised the size of each room. The proeprty also includes an air-source heat pump and solar panels.  Photos by Perfect Stays www.perfectstays.co.uk/property/driftwood. Construction was completed in 2022.


Miles End

View more photos →

New 7,000sq. ft Dwelling – Epsom

Miles End is a new 7,000 sq. ft dwelling designed around the life-style of a local family who have lived in the area for many years. The primary objective of the design was for each ‘zone’ of the property to function efficiently.  The introduction of a large three-storey void through the centre of the property meant that we were able to minimise the need of internal corridors and fill each area with natural light. The property includes a triple garage, home Gym, Golf Simulator, Cinema Room, double-height Kitchen, a detached Garden Building and a putting green. Construction was completed in 2019. Photos by Gareth Trygve Bayly www.garethbayly.com


Ottways Lane

View more photos →

Two new 5-Bedroom Dwelling – Ashtead

The site is located in an area of Ashtead, Surrey that has seen a lot of developments over recent years. This project consists of demolishing the existing bungalow and erecting two new 5-bedroom detached properties.  The houses have been designed using traditional materials and details to fit in with the surrounding houses.  Construction was completed in 2016.